Reports : State-wise> District-wise>Block-wise >Village-wise | |||||
State : BIHAR | District : MADHUBANI | DPR Code: 1010 | |||
Block : Jhanjharpur | Village : Naruar |
Village-wise Snapshot | ||
1 | Coverage Category(Un-Electrified/De-Electrified/Electrified) | Electrified |
PROPOSED INFRASTRUCTURE DETAILS | ||
2 | No.of Rural Household(RHH) Connections to be Released | 503 |
3 | No.of BPL Connections to be Released | 200 |
4 | No. of Distribution Transformers(DTs) to be Installed* | 3 |
5 | Capacity(KVA) of Distribution Transformers(DTs) to be Installed* | 30.00 |
6 | Length (Km) of 11KV Line to be Erected * | 3.00 |
7 | Length(Km) of LT Line to be Erected* | 0.30 |
PROGRESS AS ON | ||
8 | Rural Households Connections Completed(BPL+APL) | |
9 | Number of BPL Households Connections Completed | |
10 | SC HH (Out of Total BPL HH) | |
11 | ST HH (Out of Total BPL HH) | |
12 | Total No. Habitations | |
13 | Total No. of Dalit Bastis | |
14 | Number of Distribution Transformer (Capacity) Installed | |
15 | 11kv line length(Km) Completed in the Village | |
- single phase | ||
- three phase | ||
16 | LT line length(Km) Completed in the Village | |
- single phase | ||
- three phase | ||
17 | ABC line length(Km) Completed in the Village | |
- single phase | ||
- three phase | ||
STATUS OF VILLAGE | ||
18 | Whether all the works have been completed | No |
19 | Whether the RGGVY display board installed | No |
20 | Whether Gram Panchayat Certificate Issued | No |
21 | Whether Villages have been energised | No |
22 | Whether Franchisee has been in place | No |